Sunday, July 5, 2009

Blaupunkt Gta 2 Special Mkm Manual

Meeting of the Association with the Andalusian Water Agency

On Friday June 26, 2009, a delegation from the Association of Benin Plaza, held a working meeting with representatives of the Andalusian Agency Water in its delegation of Almeria. The meeting was very fruitful and positive for Benin.


As you might remember, the April 5, 2009 he wrote to the Director General of Infrastructure and Exploitation of the Andalusian Water Agency in Seville, Ms. Mónica González Well, about the sorry state it was in the old cemetery of Benin. From Sevilla spent our report to the Delegation of Almería of the Andalusian Water Agency. Under this, the June 29 were kindly received by the Manager D. José Manuel Merino and D. Miguel Matarín of the Delegation of Almería. For our part, we see the Vice President of the Association Amelia Sánchez Baños, accompanied by Francisco Ramón Sánchez Maldonado, José Antonio Díaz Roda, Francisco Ruiz Ramón Maldonado and I as President, Rosario Ruiz Baños.



Apart from the question of the cemetery was used to discuss various topics of interest to Benin. I commented briefly addressed and agreed.
We talked about the situation of the concrete slab of the old cemetery and its poor condition. Fully agreed with us that is necessary to find a solution. We were told that they are already working on it and that the arrangement will be performed by improvement studies Andalusian Water Agency is currently undertaking in the Swamp of Benin related to the problem of water seepage. We reassure you that water would now be covered by the cemetery because it is desembalsando the duration of these studies. The water level will rise only when the leaks are resolved and repaired the cemetery. We can rest easy.


also proposed that the benineros they could enjoy the facilities of the complex "The Mecila." We reported that the offices are the workplace of the Andalusian Water Agency and pigs can not in any way. On the houses, in general, were in very poor condition and would give not.
also discussed the issue of Viñuelas and in this issue from the start were very open to our proposals. We asked if he was given the local Cultural Association Sons of Benin and they replied that they have not had any official request of the association and there is no record of any assignment. Then talk about how we could make use of space and told us Andalusian Water Agency would yield to the Association of Benin Plaza's use and enjoyment of the amenities of Viñuelas. This preparásemos asked us a request justifying the use that was going to give this venue. This request was submitted on July 3 in the register of the Agency, so we are awaiting confirmation of the transfer to our association. By the time when we are already, this is expected after the summer. The application in detail you can read the blog of the Association of Benin Plaza, clicking here.


The next item of the meeting asked about the road that leads to Hirmes through the flat, with the intention to improve it so there would be a convenient and fast communication between Hirmes Benin and neighborhood. We were told that is a forest track that is not within the jurisdiction of the Andalusian Water. Soon will initiate the necessary arrangements with the institution of the mountains.
The last item discussed was the possibility of carrying out activities related to the environment. We talked about:
  1. Open a path - path to Cejor and walking distance to the source of Cejor, pass through the narrows and even get to the Sources of Marbella.
  2. Placement of nests and monitor their
  3. Reforestation of native plants.

The three things could be done without problems in a few months. As

see the results were very positive and the meeting we are very pleased to get things for Benin and benineros.

0 comments:

Post a Comment